Braider Head Swap Program

We supply to you a braider head that has undergone the following steps:

  • Completely disassemble, clean, paint, and refill head with new Wardwell oil.
  • Install new driver bearing shaft and oil-lite bushing in driver bearing if wear is present.
  • Install new drive clutch. Install new upper carriers, driver bars, and assemble with new pawls, pawl pins, supply rachets, holder sleeves, carrier stops, springs, and supply caps.
  • Straighten lower carriers, re-assemble with new supply rachets, holder sleeves, carrier spindle, pawl spring, spool bearing and safety pin.
  • Safety bore of carrier checked for tolerance and bushed with oil-lite bronze if wear is present.
  • Inspect brake levers and wire deflectors, reforming to original bend or replacing.
  • Highly polish all wire contact points.

 

Hometake-ups, pay-offs, extruders, preheaters, braiders. & moreLloyd & Bouvier wire & cable equipment - Home pageLloyd & Bouvier wire & cable equipment Home Page
Wire & Cable Machinery

Lloyd&Bouvier
56 Sterling St.
Clinton, MA 01510 USA

T: 978.367.5700
F: 978.365.9700
E-Mail
Map to L&B